LOAD CARRIER WITH MODE CHANGER
Patent Abstract / Summary
[0001] A multi-mode load carrier is convertible to assume a storage mode, a cart mode, and a hand-truck mode. The load carrier includes a rolling base and a base pusher having a handgrip.
IPC Classifications
Priority Claims
Designated Contracting States (38 EPC States)
Parties & Representation
Applicants
Dorel Home Furnishings, Inc.
410 East South First Street, Wright City, MO 63390
USInventors (1)
Gibson, William R.
621 South DePeyster, Kent, Ohio 44240
USRepresentatives / Agents
Schneiders & Behrendt München
Schneiders & Behrendt, PartmbB Patentanwälte München
DEKiriczi, Sven Bernhard
Schneiders & Behrendt PartmbB, Patentanwälte, München
DEAndrejewski - Honke Patent- und Rechtsanwälte Partnerschaft mbB
An der Reichsbank 8, 45127 Essen
DEKey Procedural Dates
Patent Oppositions
Official opposition proceedings filed against European Patent EP3269617 under EPC Article 99.
Kompernaß Handelsgesellschaft mbH
Burgstraße 21, DE
Andrejewski - Honke Patent- und Rechtsanwälte Partnerschaft mbB
2021-08-09
Legal Status & Event History
Official European Patent Office legal and procedural status changes recorded for this file.
| Date | Code | Event Description | Auth |
|---|---|---|---|
| 2018-01-17 | 17P | REQUEST FOR EXAMINATION FILED | EP |
| 2018-01-17 | AK | DESIGNATED CONTRACTING STATES | EP |
| 2018-01-17 | AC | DIVISIONAL APPLICATION: REFERENCE TO EARLIER APPLICATION | EP |
| 2018-08-22 | RBV | DESIGNATED CONTRACTING STATES (CORRECTED) | EP |
| 2019-09-11 | 17Q | FIRST EXAMINATION REPORT DESPATCHED | EP |
| 2020-08-12 | INTG | INTENTION TO GRANT ANNOUNCED | EP |
| 2020-07-16 | GRAP | DESPATCH OF COMMUNICATION OF INTENTION TO GRANT A PATENT | EP |
| 2020-10-06 | GRAS | GRANT FEE PAID | EP |
| 2020-10-09 | GRAA | (EXPECTED) GRANT | EP |
| 2020-11-11 | AK | DESIGNATED CONTRACTING STATES | EP |
| 2020-11-11 | AC | DIVISIONAL APPLICATION: REFERENCE TO EARLIER APPLICATION | EP |
| 2020-11-11 | REG | REFERENCE TO A NATIONAL CODE | EP |
| 2018-11-09 | TPAC | OBSERVATIONS FILED BY THIRD PARTIES | EP |
| 2020-05-08 | TPAC | OBSERVATIONS FILED BY THIRD PARTIES | EP |
| 2020-11-15 | REG | REFERENCE TO A NATIONAL CODE | EP |
| 2020-11-13 | REG | REFERENCE TO A NATIONAL CODE | EP |
| 2020-12-03 | REG | REFERENCE TO A NATIONAL CODE | EP |
| 2020-12-09 | REG | REFERENCE TO A NATIONAL CODE | EP |
| 2021-04-15 | REG | REFERENCE TO A NATIONAL CODE | EP |
| 2021-04-14 | REG | REFERENCE TO A NATIONAL CODE | EP |
| 2020-10-09 | STAA | INFORMATION ON THE STATUS OF AN EP PATENT APPLICATION OR GRANTED EP PATENT | EP |
| 2020-07-16 | STAA | INFORMATION ON THE STATUS OF AN EP PATENT APPLICATION OR GRANTED EP PATENT | EP |
| 2019-08-05 | STAA | INFORMATION ON THE STATUS OF AN EP PATENT APPLICATION OR GRANTED EP PATENT | EP |
| 2017-12-15 | STAA | INFORMATION ON THE STATUS OF AN EP PATENT APPLICATION OR GRANTED EP PATENT | EP |
| 2017-12-15 | PUAI | PUBLIC REFERENCE MADE UNDER ARTICLE 153(3) EPC TO A PUBLISHED INTERNATIONAL APPLICATION THAT HAS ENTERED THE EUROPEAN PHASE | EP |
| 2021-04-30 | PG25 | LAPSED IN A CONTRACTING STATE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
| 2021-05-31 | PG25 | LAPSED IN A CONTRACTING STATE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
| 2021-06-10 | REG | REFERENCE TO A NATIONAL CODE | EP |
| 2021-06-30 | PG25 | LAPSED IN A CONTRACTING STATE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
| 2021-07-30 | PG25 | LAPSED IN A CONTRACTING STATE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
| 2021-08-09 | REG | REFERENCE TO A NATIONAL CODE | EP |
| 2021-08-31 | PG25 | LAPSED IN A CONTRACTING STATE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
| 2021-09-15 | 26 | OPPOSITION FILED | EP |
| 2021-10-29 | PG25 | LAPSED IN A CONTRACTING STATE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
| 2021-11-30 | PG25 | LAPSED IN A CONTRACTING STATE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
| 2022-01-03 | PLBB | REPLY OF PATENT PROPRIETOR TO NOTICE(S) OF OPPOSITION RECEIVED | EP |
| 2021-08-22 | PLAX | NOTICE OF OPPOSITION AND REQUEST TO FILE OBSERVATION + TIME LIMIT SENT | EP |
| 2021-08-13 | PLBI | OPPOSITION FILED | EP |
| 2022-01-31 | PG25 | LAPSED IN A CONTRACTING STATE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
| 2022-02-28 | REG | REFERENCE TO A NATIONAL CODE | EP |
| 2022-04-04 | PG25 | LAPSED IN A CONTRACTING STATE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
| 2022-04-04 | REG | REFERENCE TO A NATIONAL CODE | EP |
| 2022-04-29 | PG25 | LAPSED IN A CONTRACTING STATE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
| 2022-06-10 | PLBP | OPPOSITION WITHDRAWN | EP |
| 2022-06-01 | PG25 | LAPSED IN A CONTRACTING STATE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
| 2022-06-17 | PLBP | OPPOSITION WITHDRAWN | EP |
| 2022-07-29 | PG25 | LAPSED IN A CONTRACTING STATE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
| 2022-10-31 | PGFP | ANNUAL FEE PAID TO NATIONAL OFFICE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
| 2023-05-29 | RDAF | COMMUNICATION DESPATCHED THAT PATENT IS REVOKED | EP |
| 2023-05-31 | PG25 | LAPSED IN A CONTRACTING STATE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
| 2023-06-28 | P01 | OPT-OUT OF THE COMPETENCE OF THE UNIFIED PATENT COURT (UPC) REGISTERED | EP |
| 2023-06-30 | PG25 | LAPSED IN A CONTRACTING STATE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
| 2023-09-15 | RDAG | PATENT REVOKED | EP |
| 2023-09-15 | STAA | INFORMATION ON THE STATUS OF AN EP PATENT APPLICATION OR GRANTED EP PATENT | EP |
| 2023-06-09 | REG | REFERENCE TO A NATIONAL CODE | EP |
| 2023-09-29 | REG | REFERENCE TO A NATIONAL CODE | EP |
| 2023-10-18 | 27W | PATENT REVOKED | EP |
| 2023-10-18 | GBPR | GB: PATENT REVOKED UNDER ART. 102 OF THE EP CONVENTION DESIGNATING THE UK AS CONTRACTING STATE | EP |
| 2023-10-31 | PGFP | ANNUAL FEE PAID TO NATIONAL OFFICE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
| 2024-04-30 | PG25 | LAPSED IN A CONTRACTING STATE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
| 2024-09-30 | PG25 | LAPSED IN A CONTRACTING STATE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
| 2025-12-12 | PG25 | LAPSED IN A CONTRACTING STATE [ANNOUNCED VIA POSTGRANT INFORMATION FROM NATIONAL OFFICE TO EPO] | EP |
Patent & Non-Patent Citations
Cited documents and prior art referenced in search and examination reports.
Cited Patent Documents
Non-Patent Scientific Literature (NPL)
Worldwide Patent Family
Related applications and patents in the same INPADOC worldwide family.
| Country | Publication Number | Kind | Publication Date | Action |
|---|---|---|---|---|
| EP | EP3269617A1 | A1 | 2018-01-17 | Espacenet |
| EP | EP3269617B1 | B1 | 2020-11-11 | Espacenet |
| CA | CA2918059A1 | A1 | 2015-01-15 | Espacenet |
| CA | CA2918059C | C | 2018-06-12 | Espacenet |
| CN | CN105531173A | A | 2016-04-27 | Espacenet |
| CN | CN105531173B | B | 2017-08-08 | Espacenet |
| CN | CN107323496A | A | 2017-11-07 | Espacenet |
| CN | CN107323496B | B | 2019-06-28 | Espacenet |
| DE | DE202014011052U1 | U1 | 2017-07-24 | Espacenet |
| EP | EP3019383A1 | A1 | 2016-05-18 | Espacenet |
| EP | EP3019383A4 | A4 | 2017-03-29 | Espacenet |
| EP | EP3019383B1 | B1 | 2018-05-30 | Espacenet |
| EP | EP3798091A1 | A1 | 2021-03-31 | Espacenet |
| EP | EP3798091B1 | B1 | 2025-05-28 | Espacenet |
| KR | KR20160033139A | A | 2016-03-25 | Espacenet |
| KR | KR101787297B1 | B1 | 2017-10-18 | Espacenet |
| MX | MX2016000435A | A | 2016-08-03 | Espacenet |
| TW | TW201515896A | A | 2015-05-01 | Espacenet |
| TW | TWI609809B | B | 2018-01-01 | Espacenet |
| US | US2015014965A1 | A1 | 2015-01-15 | Espacenet |
| US | US9096249B2 | B2 | 2015-08-04 | Espacenet |
| US | US2015298714A1 | A1 | 2015-10-22 | Espacenet |
| US | US9211894B2 | B2 | 2015-12-15 | Espacenet |
| WO | WO2015006760A1 | A1 | 2015-01-15 | Espacenet |
Complete European Patent Register Dossier (148 Total Documents)
The full inspection file for Application EP17170856 contains 148 total documents, including all notices of opposition, proprietor counter-statements, examination communications, third-party observations, and procedural forms. Below are all major recorded procedural filings and publication specifications.
Recorded Filings & Patent Specifications
Official publication specifications, opposition filings, proprietor replies, and procedural submissions.